Thursday, August 20, 2009

Daily Update, August 20

Refrigerator and wine/beer cooler came today, but since the cabinet hasn't been fixed yet, they're sitting in the garage in their boxes. I'm dying to see them, but will resist the temptation to open the boxes until they're ready to put in place. Only a few more weeks now. But very likely the week after labor day.


Gary has started on the fireplace. He's got quite a lot of figuring to do and I guess these are his notes and practice runs with scrap wood.

More lighting fixtures. And I can't resist posting pictures of Amber's room. Miles is already tired of the pink and wondering when we can paint it.

Hall fixture lights.

Tyler's room.

Cory's room


Master fan.

Master shower. The tile is grouted and it looks awesome.

Linen shelves in the master bathroom.


Tile entry. He just set this today so the tile is dirty and hasn't been grouted. It's amazing how much better the tile looks after the grout is in.



Wednesday, August 19, 2009

Garage Door

Garage doors were replaced (warranty replacement) and the garage door openers were installed. They are all operational and our code even works for the closest door.


Kitchen Tile - Grout

Kitchen tile looking better every day.






Railing Installed

The railing is in for the stairs up to the kid's rooms. It turned out really well. I have to admit, I was bummed about putting the newell post in the middle of the curve, but it turned out ok.