skip to main
|
skip to sidebar
Fossil Ridge Farm
Wednesday, August 5, 2009
Kids' Bathroom Tile
Tile is coming together in the kids rooms. Here is the backspash in Tyler's bathroom.
Here is the boy's shared shower/tub.
Cory's backsplash.
Amber's backsplash.
Amber's shower.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2009
(146)
►
September
(15)
▼
August
(31)
Final Grading - Front
Final Grading - North Views
Final Grading - Northeast Views
Kitchen Pendants
Built-Ins Almost Complete
Railing
Built-Ins and Fireplace
Another Daily Misc Update
Daily Update, August 20
Garage Door
Kitchen Tile - Grout
Railing Installed
Ceiling Fans
Even More Lights
Mistake
Wood Floor - Finish Coat #1
Driveway Complete
Newell Posts
Lighting Fixtures
Dream Kitchen - Range Backsplash
Stair Railing Base
Viking Hood Installed
Growing Concrete
Current Exterior Views - August
Driveway Forms
Rail Bender
Master Closet & Shower
Kids' Bathroom Tile, part II
Septic and Leachfield
Kids' Bathroom Tile
Staining the Woodwork
►
July
(21)
►
June
(12)
►
May
(18)
►
April
(14)
►
March
(12)
►
February
(8)
►
January
(15)
►
2008
(61)
►
December
(12)
►
November
(15)
►
October
(5)
►
September
(3)
►
August
(2)
►
June
(3)
►
May
(13)
►
April
(8)
►
2007
(2)
►
May
(2)
Labels
Amber's room
appliances
arches
back porch
basement
bathrooms
bonus room
budgeting
building permit
built ins
cabinets
carpet
ceiling fans
city process
closets
concrete
construction
Cory's Room
countertops
decisions
deck
decorating
design
ditch
doors
dream house
driveway
drywall
easements
electrical
engineering
exterior
exterior design
fascia
final days
finanacing
fire sprinkler
fireplace
first days
flooring
foundation
framing
front porch
frustrations
garage
getting started
grading
granite
great room
house design
HVAC
Insulation
interior design
kids bathrooms
kitchen
kitchen design
landscaping
leachfield
lighting
lockers
master bath
master closet
mud room
natural gas
neighbors
paint
pantry
picture chronology
plumbing
plumbing fixtures
porches
railing
road blocks
roof
schedule
selling Bluestem
septic
stain
stairs
stucco
sump pumps
tile
traffic engineering
trim
trusses
Tyler's room
upstairs
utilities
utility review
water line
weather
windows
workers
No comments:
Post a Comment