Wednesday, February 18, 2009
City Utilities
The city trenched the electric, cable and phone across the front of the property today. Not sure how far they got down the east side.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2009
(146)
►
September
(15)
►
August
(31)
►
July
(21)
►
June
(12)
►
May
(18)
►
April
(14)
►
March
(12)
▼
February
(8)
Trusses Delivered
Framing Update
Vertical - first days
City Utilities
A Lot Happens in a Week
The Steel is Here
Progress
House on the Market Today
►
January
(15)
►
2008
(61)
►
December
(12)
►
November
(15)
►
October
(5)
►
September
(3)
►
August
(2)
►
June
(3)
►
May
(13)
►
April
(8)
►
2007
(2)
►
May
(2)
Labels
Amber's room
appliances
arches
back porch
basement
bathrooms
bonus room
budgeting
building permit
built ins
cabinets
carpet
ceiling fans
city process
closets
concrete
construction
Cory's Room
countertops
decisions
deck
decorating
design
ditch
doors
dream house
driveway
drywall
easements
electrical
engineering
exterior
exterior design
fascia
final days
finanacing
fire sprinkler
fireplace
first days
flooring
foundation
framing
front porch
frustrations
garage
getting started
grading
granite
great room
house design
HVAC
Insulation
interior design
kids bathrooms
kitchen
kitchen design
landscaping
leachfield
lighting
lockers
master bath
master closet
mud room
natural gas
neighbors
paint
pantry
picture chronology
plumbing
plumbing fixtures
porches
railing
road blocks
roof
schedule
selling Bluestem
septic
stain
stairs
stucco
sump pumps
tile
traffic engineering
trim
trusses
Tyler's room
upstairs
utilities
utility review
water line
weather
windows
workers
No comments:
Post a Comment