Art niche in hallway to study. We added this when we realized the linen closet on the other side was too deep.
North wall arch to the dining room.
Saturday, May 16, 2009
Arches
Tuesday, May 5, 2009
Electrical Walk Through
We made some changes on Cory's wall to make the wall look better and not be one huge flat plane. The electrician had some great ideas and we took about a foot out of his room along the hallway wall and added a foot by making the bathroom and closet smaller. The hallway will have a big bookcase and art niche to break up the big plane.
We decided not to design the fireplace wall around our current tv. The dimensions weren't working and to get the tile and bookcases around the fireplace, we lost the space for the tv. Our current tv is 66" wide and 24" (or more) deep and would require venting in the back. It got too cumbersome to try to plan the wall around that tv and I didn't want to give up the look and the intent of making the fireplace the centerpiece of the room. It would also require us to make some changes to the bookcases that would need additional framing. The electrician also mentioned that buying a new tv would actually save us $$ on electric as well.
We decided to not put fans in the great room because with the dual furnaces, we have a lot of air movement and circulation and the fans would not be visible from the bottom floor. Cleaning and replacing light bulbs would also be problematic. Instead we'll be putting some can lights close to the edges and floor outlets for lamps.
The bonus room doesn't lend itself to fans very well either, but we think we need them, so we'll be using flush mount fans mounted closer to the dormers so that they don't impede traffic through the room. The tv we have now will need to go up there on the far wall. We'll be putting 8 cans plus the 2 lights in the fans.
The kitchen will have lots of cans, plus a chandelier in the kitchen nook and 4 pendants over the bar. Both Jamie K and the lighting consultant said we should put an odd number, so 3 or 5, but I really thought 3 wouldn't be enough and 5 would be too much. So they allowed me to designate 4.
Since the master bedroom has a huge vaulted ceiling, the can lights wouldn't work for the bedside lighting. We chose 2 wall sconces and off centered the bed to allow a seating area on the northwest wall. The big armoire will go in the nook and my big dresser will go along the same wall next to the door.
Other decisions made today:
- Nixed the fake chimney's
- Added 4 circuits and 8 outlets for the garage, no 220
- Added 2 ceiling fans on the back deck
Saturday, May 2, 2009
Progress Meeting
- Fireplace design. I roughed out a sketch of what we want the fireplace wall to look like. I'm very excited about it.
- The second furnace for upstairs is going to be located in Tyler's attic. I'm not so sure about it, but Wayne assures us that it will not be a noise nuisance and that it is quite common in other parts of the country.
- Started on fascia and soffett work.
- Finalized the decision to frame Cory's room in.
- Need to discuss all the arches with Jamie K. (interior designer) and Troy again. We're now not sure that we want to arch everything.
- Made decisions on door to garage and then garage door to exterior. We're going with fiberglass for the mud room/garage door and steel for the garage/exterior.
- Doing our electrical walk through on Tuesday with the electrician, the light designer and Jamie K.
Wow, now some of the fun things are starting to happen. I think I'm going to start getting anxious. We have hardwood floor decisions, lighting, tile, etc. coming up. I ordered samples from Armstrong floors for Mahogany, Brazilian Cherry, Hickory, Maple, Walnut and Birch (my preference is in this order). Our trim work will be in Alder. The built-ins will mostly be Alder, but may do Cherry in the great room. The kitchen and master cabinets are Cherry. Cabinets in the mud room and kids bathrooms is Alder. I hope we don't regret that decision since it is a relatively soft wood. Oh well.
Staircase to the bonus room:

Friday, May 1, 2009
Dried In

Notice the big window missing in the back. This one was stored and shipped upside down, so the frame bent. The glass company came out to fix it on site and broke the glass as they were trying to fix it. Soooo, they had to order a new window. I'm not sure how long it will take to get in.

Tuesday, April 28, 2009
Week is Shaping Up
We should also be 'dried in' by the end of the week and windows starting to be placed.
Sunday, April 26, 2009
Saturday, April 25, 2009
Lots of Activity
- Master shower bench and fixture placement.
- Fireplace details and location.
- Posts and arches in the great room, dining room and hallways.
Progress seems to be picking up and I think the weather will be reasonable.
Thursday, April 23, 2009
More Progress
- The windows have been delivered. One was broken and one is damaged.
- The duct work and air handler are in for the main floor.
- There are some holes drilled for sinks and toilets.
- We have some tub color samples for the upstairs tubs.
- The trusses are complete for the dormers and the roof is all sheated.
- They're having a hard time trying to figure out how they are going to get the stairs to the bonus room worked out since the engineers added a steel beam in the mud room.
- The back porch and back roof support beam is in.
We're meeting Wayne out there tomorrow at lunch to review a few things so will get picture updates tomorrow.
Wednesday, April 22, 2009
Back Porch Grading
Tuesday, April 21, 2009
April Update
- HVAC people there today cutting holes for heating vents.
- HVAC people were there yesterday laying out the system.
- Final grading for the back porch should be complete today so that the framers can finish the back roof trusses and framing.
- Garage door guy swung out and showed me samples of garage doors - do we want wood? paint? Some neat products out there.
- Kitchen guy showed up to lay out kitchen island for plumbing to sink and dishwasher. There will also be some framing they need to do on this.
- Decided that we'd rather go over budget on the kitchen, but not the garage doors!
- Someone was there cleaning up the basement and main floor for the plumbers to come in.
- Wayne ordered white tubs for upstairs - bleh! Put a stop to that and now will need to look at colors available.
- Decided that claw foot tubs wouldn't be worth the price for the 2 bathrooms upstairs.
More pictures tonight of the final back porch grading if they got that done.
Monday, April 20, 2009
Another Framing Update
Sunday, April 19, 2009
Bonus Room
Wednesday, April 8, 2009
Back Porch Preparation & Window Wells
We also recently learned that we are about 4 weeks behind schedule. Instead of August 1, we are probably looking at September 1. They are bringing an additional framer on site to help speed up the process a bit. It was slow going for awhile because of all of the angles.
Upstairs
Front Porch Trusses
Thursday, April 2, 2009
Great Wall
Tuesday, March 31, 2009
Cory's Room
Horrible Weather
I'm not really sure where they are on septic and water line which they were going to do last Thursday when we got our snow. We are also supposed to get snow tomorrow and on Friday again. I haven't looked at a new forecast, so need to check with Wayne.
It is sunny and calm right now, so hopefully they're getting some work done today. They now have a lift to help get all the material up to the roof for them so they don't have to carry it up and down. More pictures hopefully this afternoon.