Thursday, September 10, 2009
Wednesday, September 2, 2009
Saturday, May 2, 2009
Progress Meeting
- Fireplace design. I roughed out a sketch of what we want the fireplace wall to look like. I'm very excited about it.
- The second furnace for upstairs is going to be located in Tyler's attic. I'm not so sure about it, but Wayne assures us that it will not be a noise nuisance and that it is quite common in other parts of the country.
- Started on fascia and soffett work.
- Finalized the decision to frame Cory's room in.
- Need to discuss all the arches with Jamie K. (interior designer) and Troy again. We're now not sure that we want to arch everything.
- Made decisions on door to garage and then garage door to exterior. We're going with fiberglass for the mud room/garage door and steel for the garage/exterior.
- Doing our electrical walk through on Tuesday with the electrician, the light designer and Jamie K.
Wow, now some of the fun things are starting to happen. I think I'm going to start getting anxious. We have hardwood floor decisions, lighting, tile, etc. coming up. I ordered samples from Armstrong floors for Mahogany, Brazilian Cherry, Hickory, Maple, Walnut and Birch (my preference is in this order). Our trim work will be in Alder. The built-ins will mostly be Alder, but may do Cherry in the great room. The kitchen and master cabinets are Cherry. Cabinets in the mud room and kids bathrooms is Alder. I hope we don't regret that decision since it is a relatively soft wood. Oh well.
Staircase to the bonus room:
Thursday, April 23, 2009
More Progress
- The windows have been delivered. One was broken and one is damaged.
- The duct work and air handler are in for the main floor.
- There are some holes drilled for sinks and toilets.
- We have some tub color samples for the upstairs tubs.
- The trusses are complete for the dormers and the roof is all sheated.
- They're having a hard time trying to figure out how they are going to get the stairs to the bonus room worked out since the engineers added a steel beam in the mud room.
- The back porch and back roof support beam is in.
We're meeting Wayne out there tomorrow at lunch to review a few things so will get picture updates tomorrow.
Tuesday, April 21, 2009
April Update
- HVAC people there today cutting holes for heating vents.
- HVAC people were there yesterday laying out the system.
- Final grading for the back porch should be complete today so that the framers can finish the back roof trusses and framing.
- Garage door guy swung out and showed me samples of garage doors - do we want wood? paint? Some neat products out there.
- Kitchen guy showed up to lay out kitchen island for plumbing to sink and dishwasher. There will also be some framing they need to do on this.
- Decided that we'd rather go over budget on the kitchen, but not the garage doors!
- Someone was there cleaning up the basement and main floor for the plumbers to come in.
- Wayne ordered white tubs for upstairs - bleh! Put a stop to that and now will need to look at colors available.
- Decided that claw foot tubs wouldn't be worth the price for the 2 bathrooms upstairs.
More pictures tonight of the final back porch grading if they got that done.